Mask-aware building load estimation

Estimates that say what they know, and admit what they do not.

A staged programme of models for early-design energy assessment. Each phase takes whichever variables exist at that point in a project and returns a load estimate, an interval, and an intensity class it is willing to defend โ€” never a single number pretending to certainty it has not earned.

Enter Phase 1 ยท Early-stage load estimate โ†’

01

Partial information is the norm

At concept stage most inputs do not exist yet. The models answer from whichever subset the engineer actually has, instead of demanding a complete building.

02

Solid means known, hollow means unknown

One visual rule runs through every screen, and it applies to inputs and outputs alike. A withheld variable and an excluded class look the same way wherever you meet them.

03

Uncertainty is the product

Every estimate carries a 90% interval and a prediction set. An answer that spans two classes is reported as spanning two classes โ€” that is the honest result, not a failure.


Programme

Phase 1Model unavailable

Site context and building programme

  • no registered capability
Not available yet
Phase 2Model unavailable

Building configuration and structure

  • no registered capability
Not available yet
Phase 3Model unavailable

Envelope and passive performance

  • no registered capability
Not available yet
Phase 4Model unavailable

HVAC design and controls

  • no registered capability
Not available yet